PEB Erection & Installation

Erection and installation of pre engineered buildings. This includes frame erection, purlins, girts, bracing, roofing, wall cladding, insulation, gutters and final alignment for industrial buildings and warehouses.

DESIGN AND FABRICATION,TESTED ON SITE.

The site is where design and fabrication are tested in real conditions. Our erection teams join frames, bracing and secondary steel to the accuracy the design needs.

Roofing, wall cladding, insulation and gutters follow the steel erection. The same crew who raised the frame closes the building, so there is no handover between different contractors.

Scope of Work
Structural Erection
Roofing & Cladding
Final Alignment

WHAT WEBUILD & DELIVER.

Products

  • 01

    Erected Steel Structures

    Main and secondary steel fully erected and ready for roof and wall sheets.

  • 02

    Installed Roofing & Cladding Systems

    Roof and wall sheets fitted as part of the same erection work.

Services

  • 01

    Structural Erection

    Frames, bracing and secondary steel are put together at the site to the accuracy the design needs.

  • 02

    Structural Steel Erection Coordination

    Erection order, crew and equipment are planned against the site plan, stage by stage.

  • 03

    Roofing & Cladding Installation

    Roof sheets and wall cladding are fitted as the steel erection finishes.

  • 04

    Skylight Installation

    Skylight panels are fitted along with the roof, not added later.

  • 05

    Insulation Installation

    Insulation is fitted as part of the roof and wall system.

  • 06

    Industrial Construction Coordination

    Other construction work at the site is coordinated with the steel erection.

  • 07

    Complete Delivery Coordination

    Design, fabrication, supply and erection follow one plan from drawing to handover.

  • 08

    Final Alignment & Handover

    Final alignment is checked and approved before we hand over the building.

BUILT INTOTHE SCOPE.

01Frame and bracing erection
02Roofing, cladding and insulation
03Final alignment and handover
PEB Erection & Installation, Swarup Enterprises PEB project reference

Where the design meets the real site.

FREQUENTLYASKED QUESTIONS

Straight answers on peb erection & installation , how it works, what it involves and where it fits.

Still have questions?

Share your project brief, we'll respond with technical fit, feasibility and next steps.

Discuss Your Project

PEB erection means putting together the made steel parts at the site to form the building. It is followed by roofing, cladding, insulation and finishing work.

One crew for both avoids gaps between contractors and keeps the work moving from frame to finished building.

It depends on the size of the building, the site conditions and the weather. Once we know your building size and site details, we can give a clear time estimate.

The foundation and anchor bolts should be complete and checked. The site should also have clear access for trucks and cranes, and space to store the steel.